Collection: Phase 3 - Walls, Ceiling & Flooring
Phase 3: Walls, Ceiling & Flooring
With insulation and electrical routed (Phases 1–2), Phase 3 closes in the van's interior shell — ceiling, wall panels, and finished flooring — creating the finished surfaces that cabinetry and bed systems mount to in Phase 4.
What's included in this phase
-
Ceiling kits — CNC-cut ceiling kits for Sprinter and ProMaster that align to factory mounting points.
-
Wall/door panels — upholstered sliding-door panel kits for a finished interior look.
-
Flooring — LONSEAL Lonridge flooring for a durable, slip-resistant finished floor (shared with Phase 1's subfloor prep).
Finishing these surfaces before Phase 4 means cabinetry and bed systems mount to clean, finished walls rather than bare metal.
Previous: Phase 2: Power Systems. Next: Phase 4: Cabinetry.